This
project was initiated in 2003 and completed in 2004. This operation is
unique
in France, carried out in a short period, is the result of a
collaboration
between the artist, the mayor of Amneville, teams of RTE, and the
contractors.
At
the end of April 2003
to May: Completion of the mechanical study
This study
aimed to examine and validate the technical feasibility of different
artistic
projects proposed by Elena Paroucheva, namely to verify that the
addition of
guys, for example, would corrupt affect the solidity of pylons.
From May to June 2003: Validation by the
Cabinet study, Study of lighting
The study mechanical completion, the Cabinet
architecture developed then the technical project, ie the
specifications to be met for the development of the work.
Meanwhile, studies have been conducted to determine the most suitable
lighting the artwork. The final choice was based on a
monochrome
lighting directed from the ground.
From June to September 2003: Negotiating
contracts and procurement orders
The specifications "purchase" on the
transformation of the towers has been completed. The consulting firms
takes place and two companies were selected, one for the painting and
another for civil engineering.
From October to November 2003: The work is
done
Companies can now
begin work: pouring foundations, painting, installation of cables.